Projects & Partners

Mining Sector (Tanzania)

  • Geita Gold Mines, Geita
    geita
  • Shanta Mines, Mbeya

Contacts:

Bamboo Rock heavy Equipment
Ryan Weinan, Managing Director
+255 784 667 760
ryan@bamboo-rock.com

  • Mantra Resources, Songea – mantra_tz

Contacts:

Mantra Tanzania Ltd
Tony Devlin, Managing Director
+255 756 443 596
tony.devlin@mantratanzania.com 

  • African Barrick Gold
    african_bar
  • Bulyanhulu Gold Mines, Bulyanhulu
  • Pangea Gold Mines, Tulawaka
  • Pangea Gold Mines, Buzwagi
  • North Mara Gold Mines, Nyamongo

Last Major Barrick Projects:

PC 4000 Excavator move from North Mara Mine to Buzwagi Mine.  12 Loads, the largest being the Excavator body at 48 Tons

Delivery of 35 Ton Ball Mill Motor to the Buzwagi Minesite in Northern Tanzania.  This was a “Rush” job to eliminate mine down-time.  It also included the placement of a 200 Ton lattice boom crane. The crane was moved on 10 trailers.

Contacts:

African Barrick Gold   Gerry Bowers, Procurement Manager
+255 753 730 700
gbowers@ barrick.com

  • Resolute T Ltd – Golden Pride, Nzega
    resolute

Contacts:

David Huk, Supply Chain Manager
+255 752 308 175
daveh@resolute-ltd.com.au

Drilling Sectors – Mines & Oil

  • Capital Drilling
    capital
  • Tandrill
  • Dominion Oil & Gas
  • Maurel & Prom
  • Tullow Oil
  • Caroil

Oil & Gas Drill Rig moves

The movement of drill rigs is generally to fairly inaccessible locations, therefore we start with a detailed route assessment to ensure that there will be no surprises along the route.  Where problems or concerns are raised we have to look at alternate routes.

A standard rig move (in and later out or relocation) takes 25 trucks to transport all the parts over 10-12 days in either direction.  This includes both the drill rig, the accommodations and any service equipment.

  • SBI International Holdings AG. (T)

Contacts:

David Amrami, Managing Director
+255 767 168 958
david@sbi-tz.com

 Power Sector

  • Dowans Power Project
  • Aggreko – 60 MW Ubungo Power Project

Contacts:

Aggreko International Projects Ltd
Mr. Patrick O’ Driscoll, Director Gas Power
+971 505 510 725
Patrick.ODriscoll@aggreko.ae

Importers & Suppliers

  • Sandvik Mining & Construction
  • Mantrac Tanzania Ltd – Movement of major Caterpillar Mining Equipment
  • Spedag International (T) LTD. – spedag

Contacts:

Dirk Matthysen, General Manager
Spedag International (T) LTD.
Cell Phone:   +255 683 567 157
SKYPE: riketik123

  • Mopani Coper Mines, Zambia – Refit of Mining Process Plant 
  • Mining Agriculture & Construction Services (MACS) – macs
  • Tanzania Breweries (TBL) – Dar & Mbeya Projects
    breweries

Last Major TBL Project:

Complete Logistics project in partnership to build the Tanzania Brewery in Mbeya.

This project included the largest pieces moved to date on Tanzanian roads.  These were the 18 brewing vessels 6½ M diameter by 18 M length.

We had to construct special trailers to accommodate these tanks.

Some of our other clients include:
partners